House and Land Packages

House and Land Packages

Search our wide range of house and land packages, or contact us for exclusive off market packages. 

Never before seen

ABC is changing the way you buy house and land packages, never before has it been possible to tailor a house and land package to suit your individual budgets, design and area requirements, all with confidence in pricing and a truly complete list of turnkey included items. All fo this with a wide range of builders to suit your wants and needs.

If you are looking to buy a house and land package you need to read this!

Are you tired of what’s included and what’s not included into your new homes list of inclusions? Or maybe you’re too worried about building a new house because of the huge price increases builders tend to surprise you with. 

Maybe you’re thinking it all seems too hard!

Guess what, we feel the same… the traditional way to build a new home is too hard and stressful for everyday Aussies.

So we came up with an idea: let’s offer 100% fully finished turnkey packages all at a 100% fixed price inclusions list.

Now you may be asking what does this all mean?

Firstly, your house is finished when you move in. No “sorry this was never included, you’ll have to finish it later”! We even include items like blinds, letter boxes, driveways and air conditioning.

This is also going to mean you won’t have an ever growing fear of the price exploding your budget.
For more information about our %100 turnkey fixed price inclusion items house and land packages, get in touch today.

 

*Search our wide range of packages

*ABC are there for you every step of the way

*Exclusive, off market packages available on request

*No more fear of big price blow outs

* Finished homes, ready to move in with no more to pay

* Tailored to your budget, design requirements and location

* 100% fixed price inclusions and 100% turnkey homes

* Wide range of builders to work with

* A simple, stress free and affordable building process

Why not build your own package?

WebPic011

Search Packages

Turnkey House & Land Package in Ottoway

OTTOWAY SA

$349,990 – $364,990

Description

This house* is to be constructed.

Adelaide Building Consulting’s office has implemented precautionary measures for the safety of our clients and staff.

Adelaide Building Consulting specialise in house and land packages.
Our packages are 100% completed TURNKEY with 100% FIXED PRICE inclusions!

Have a look at some of our inclusions below and if you want more, lets have a chat.

INCLUSIONS
Footing construction report.
Connection to sewer, mains water, ETSA, gas
Termite treatment (chemical spray)
Home indemnity insurance, Building warranty
3-month maintenance period
Siteworks and foundation to engineers specification
Timber Frame internally to manufacturers specification
modular face brickwork generally with rolled grey mortar
Powder coated aluminium windows with locks
Powder coated aluminium fly screens
Colour Bond – standard degree in roof pitch, OG type gutters rectangular downpipes fascias
450mm eaves
2400mm high ceilings
10mm plasterboard lining to ceilings
10mm plasterboard lining to walls
55mm cove cornices
10mm timber reveals
R2 insulation to external walls
R4 insulation to ceilings
Light furnishing and switches
Single and double power points, Safety switch and circuit breakers
Telstra points, Smoke detectors, TV point
Free Standing vanity unit with built in hand basins
Toilet suite (duo flush)
Bath to main bathroom
1 & 3/4 bowl stainless steel sink to kitchen
Chrome mixer taps to sink
Chrome tapware
External tap
Classic built in sink and cabinet unit
Cupboards with post formed laminate tops
Linen cupboard with shelves
Stainless Steel Oven
Stainless Steel Cooktop
Stainless Steel Range hood
Electric Ignition Gas instantaneous hot water system
Full heating & cooling air conditioning
Dishwasher prevision
Solid timber door
Garage: Automatic garage door
Front with separate deadlock keyed alike
Garage door with deadlock keyed alike
55mm architraves
55mm skirtings
Skirting tile to wc, laundry and vanity room
Floor tiling to bath, laundry, WC, vanity room
Tiles to front porch, Carpet to bedrooms
Floor Boards to living area & hallways
2 coats acrylic system to internal walls and ceilings
900m perimeter paths & Driveways
Storm Water
Landscaping to front & rear
Letter box, clothes line
Good neighbour fencing

All packages can be tailored to suit individual budgets and circumstances.

ABC has the option of 3 inclusion pack ranges, ranging form premium included items to entry level.

*Conditions apply. Certain elevations may not match the particular floor plan published in this package and, as such, all floor plans and elevations are for illustration purposes only. We do not own the Land or benefit directly/indirectly for the sale of Land and is subject to availability. We make no representation and, to the extent permissible at law, we disclaim all liability, as to the suitability of the land to build on, or the suitability of any house design and pricing, or otherwise. You must satisfy yourself of that by inspection, or by taking professional advice, or otherwise. Pricing is indicative only and based on standard costings. Price may vary depending on selections, engineering, council and utility requirements and adjustments to allowances. All packages subject to final council approval.

National Building Consulting Pty Ltd T/A Adelaide Building Consulting: RLA 295167.

Inspection Time
Category House
Area
Beds 3
Baths 2
Cars 1

Adelaide Building Consulting

Can't find what you're looking for? Get in touch with us today for exclusive off market packages we have available.

Handover

Congratulations your home is now ready and at this point you will pick up your keys. However, this is not the last time we will see your maintenance period will start. From this point on, if any minor problems are to occur, you will need to make note of each of them; your builder will be back after 3 months to fix them.

Practical Completion

you will be invited to walj through your house to inspect and identify areas you wish to fix. By the end of this stage your house is about 97% done.

2nd Fix

We are almost there: your home’s cabinetry and taps are being installed and your house is now complete from the outside.

Internal Walls

Rooms take shape, internal walls go up and the colour and shape of your house start to fill out.

External Walls & Roof

At this point, all of your colour combinations and ideas will be coming to life. Your external walls and roof will be visible.

Frames

It will take approximately 4 weeks for your frames to go up. Your house is starting to take shape!

Slab

The Foundation is expected to be completed within 4 weeks consisting of trending, plumbing and concrete pour. Some clients will have a slab party, others choose to have imprints of their hands on the slab.

Construction Start Date

From the start date, there are 6 stages of construction. At each stage you can expect the builder to send you invoices. You will need to sign and send them off for processing.

Full Council Approval

Once the council gives notice of approval and appropriate insurances are in place – your builder will issue you notice of a construction start date.

Selections

This is the fun part. It’s the part where you get to choose your colours and patentially add that little bit of luxury to your home. We will let you know when selections should be booked with your builder. Allow 4-5 hours for this session.

Council Planning Approval

Council approval is required before your home can be built. Broadly, council wants to know if your house fits on the chosen block of land (Planning Application) and if the house meets all building and licensing requirements (Development Application). You are now ready to start the Planning Application.

Lodge To Council

Now you are ready to lodge your plans for council approval.

Site Investigations

Council, the builder and the architech will need to understand the condition of your block. A review of the soil, site level and engineering is needed. His proceess can take up to 3 weeks.

Building Agreements

When you are happy with your concept drawings, we will proceed to the building agreement with your chosen building company. It should take about 7 days to create the agreement.

Concept Plans

Once you have accepted the sketched floorplans, an architect will transform this sketch into more accurate concept drawings. This should take no more than 5 days.