Packages

Packages

HIGH END Inclusions Turnkey House & Land Package in Hectorville

HECTORVILLE SA

$611,920 – $624,900

Description

This house* is to be constructed.

Adelaide Building Consulting’s office has implemented precautionary measures for the safety of our clients and staff.

Prestige manor’s range integrates the opulence of bespoke contemporary interior design with the excellence of world class material and technology, prestige manor is our high end inclusion range that will be sure to statement of pure luxury.

Adelaide Building Consulting specialise in affordable house and land packages.
Our packages are 100% completed TURNKEY with 100% FIXED PRICE inclusions!
This means no hidden surprises, no price blow outs and no sorry that was not included, all of our new homes are costed 100% completed ready to move in.

INCLUSIONS
Connection to sewer, mains water, ETSA, gas
Termite treatment (chemical spray)
Home indemnity insurance, Building warranty
3-month maintenance period
Siteworks and foundation
Powder coated aluminium windows with locks
Powder coated aluminium fly screens
Colour Bond – standard degree in roof pitch, OG type gutters rectangular downpipes fascias
2700mm high ceilings
Insulation to walls
Light furnishing and switches
Single and double power points, Safety switch and circuit breakers
Smoke detectors
TV & Data points
built in hand basins
Floor to ceiling tiles to all wet areas
Bath to main bathroom
Undermount stainless steel sink to kitchen
Chrome or colour mixer taps to sink
Chrome or colour tapware
External taps
Soft close draws to all cabinetry
Stone benchtops
Linen cupboard with shelves
900mm Stainless Steel Oven
900mm Stainless Steel Cooktop
900mm Stainless Steel Range hood
Electric Ignition Gas instantaneous hot water system
Full ducted heating & cooling air conditioning
Dishwasher
Solid timber door
Panel lift garage door
Window blinds
Floor Boards to living area & hallways
Carpet to all other rooms
2 coats acrylic system to internal walls and ceilings
900m exposed aggregate perimeter paths & Driveways
Storm Water
Prestige landscaping to front & rear
Letter box & clothes line
Good neighbour fencing

CAN’T FIND WHAT YOU’RE LOOKING FOR,
ABC has 3 inclusion pack ranges, ranging from premium included items to entry level. All packages can be tailored to suit individual budgets and circumstances.
For more information get in contact, PACKAGES SELLING FAST!!!!!

*Conditions apply. Certain elevations may not match the particular floor plan published in this package and, as such, all floor plans and elevations are for illustration purposes only. We do not own the Land or benefit directly/indirectly for the sale of Land and is subject to availability. We make no representation and, to the extent permissible at law, we disclaim all liability, as to the suitability of the land to build on, or the suitability of any house design and pricing, or otherwise. You must satisfy yourself of that by inspection, or by taking professional advice, or otherwise. Pricing is indicative only and based on standard costings. Price may vary depending on selections, engineering, council and utility requirements and adjustments to allowances. All packages subject to final council approval.

Inspection Time
Category House
Area
Beds 3
Baths 2
Cars 1

Adelaide Building Consulting

Contact Us

Handover

Congratulations your home is now ready and at this point you will pick up your keys. However, this is not the last time we will see your maintenance period will start. From this point on, if any minor problems are to occur, you will need to make note of each of them; your builder will be back after 3 months to fix them.

Practical Completion

you will be invited to walj through your house to inspect and identify areas you wish to fix. By the end of this stage your house is about 97% done.

2nd Fix

We are almost there: your home’s cabinetry and taps are being installed and your house is now complete from the outside.

Internal Walls

Rooms take shape, internal walls go up and the colour and shape of your house start to fill out.

External Walls & Roof

At this point, all of your colour combinations and ideas will be coming to life. Your external walls and roof will be visible.

Frames

It will take approximately 4 weeks for your frames to go up. Your house is starting to take shape!

Slab

The Foundation is expected to be completed within 4 weeks consisting of trending, plumbing and concrete pour. Some clients will have a slab party, others choose to have imprints of their hands on the slab.

Construction Start Date

From the start date, there are 6 stages of construction. At each stage you can expect the builder to send you invoices. You will need to sign and send them off for processing.

Full Council Approval

Once the council gives notice of approval and appropriate insurances are in place – your builder will issue you notice of a construction start date.

Selections

This is the fun part. It’s the part where you get to choose your colours and patentially add that little bit of luxury to your home. We will let you know when selections should be booked with your builder. Allow 4-5 hours for this session.

Council Planning Approval

Council approval is required before your home can be built. Broadly, council wants to know if your house fits on the chosen block of land (Planning Application) and if the house meets all building and licensing requirements (Development Application). You are now ready to start the Planning Application.

Lodge To Council

Now you are ready to lodge your plans for council approval.

Site Investigations

Council, the builder and the architech will need to understand the condition of your block. A review of the soil, site level and engineering is needed. His proceess can take up to 3 weeks.

Building Agreements

When you are happy with your concept drawings, we will proceed to the building agreement with your chosen building company. It should take about 7 days to create the agreement.

Concept Plans

Once you have accepted the sketched floorplans, an architect will transform this sketch into more accurate concept drawings. This should take no more than 5 days.